Featured progresS



Fixtures & Finishes



Wishing everyone a great week ahead




Artisan Gates



Wishing everyone a great week ahead




Artisan Gates



Wishing everyone a great week ahead




Corner Stone



Wishing everyone a great week ahead




08.27.2021



Landscaping preparation work continues.



  • Topsoil and grading work complete as preparation continues for final landscape installations.

Wishing everyone a great week ahead




08.20.2021



Specialty & Finish work continues.



  • Artisan Stonework nears completion on our Immaculate Conception Shrine. .

Wishing everyone a great week ahead




08.13.2021



Specialty & Finish work continues.



  • Cedar Wood Ceiling & Beams nears completion.

Wishing everyone a great week ahead




08.06.2021



Specialty Fixtures & Finish work continues.



  • Stonework also progresses nicely outside the Building as all stonework nears completion.

Wishing everyone a great week ahead




07.30.2021



Terrace Pavers - Installation complete as stonework nears completion on the building.



  • Stonework also progresses nicely outside the Building as all stonework nears completion.

Wishing everyone a great week ahead




07.23.2021



Terrace Pavers - Installation continues as stonework progresses on the building.



  • Stonework also progresses nicely outside the Building as all stonework nears completion.

Wishing everyone a great week ahead




07.16.2021



Stonework continues on Building while Terrace & Walkway preparation continues for Landscape Pavers.



  • Stonework also progresses outside on the Building as another wall nears completion.

Wishing everyone a great week ahead




07.09.2021



Terrace & Walkway - Preparation of final grades and elevations continues.



  • Stonework also progresses outside on the Building.

Wishing everyone a great week ahead




07.02.2021



Stonework on Building near Complete...



  • Stonework progresses outside on the Building.

Wishing everyone a Happy 4th. of July!




06.25.2021



Stonework on Building Continues...



  • Stonework progresses inside the Garden Terrace & Outside on the Building.
  • Stonework Inside the Terrace Area now complete.

Wishing everyone a great week ahead!




06.18.2021



Terrace Garden Walls Complete...



  • Stonework progresses inside the Garden Terrace & Outside on the Building.
  • Stonework on the Garden Walls complete.

Wishing everyone a great week ahead!




06.11.2021



Terrace Stonework near complete...



  • Stonework progresses inside the Garden Terrace & Outside on the Building.
  • Over 160,000.00 lbs of stone will have been moved, hand cut, fitted and installed when the Mason is done.
  • Picture above showing interior terrace stonework near complete.

Wishing everyone a great week ahead!




06.04.2021



Stone work takes shape...



  • Stonework progresses inside the Garden Terrace & Outside on the Building.
  • The week ahead will see site pavers delivered as preparation continues inside the garden walls with finished stonework.

Wishing everyone a great week ahead!




05.28.2021



Capstones in place...



  • Final Niche Cabinets, Caps & Stone Trim Complete.
  • Eickhof Successfully completes Installation of all interior and exterior niche cabinets.
  • Stone Masonry work continues as the statue area takes shape.

Wishing everyone a Happy Memorial day weekend!




05.21.2021



Niche by Niche...



  • Insulation Inspection Complete.
  • Eickhof Returns: Installation of interior and exterior niche cabinets continue.
  • Interior Plywood sheathing secured to all interior walls. this in preparation of interior niche wall cabinet installations.
  • Stone Masonry work continues as another delivery from Adirondack Stone arrives on time.
  • The week ahead will see Niche Installations near complete.

Wishing everyone a great week ahead!




05.14.2021



Stone by Stone...



  • Rough Framing inspections are complete.
  • Building Insulation installed - Complete.
  • Interstate Lumber - Materials delivered for niche installation .
  • Stone Masonry work continues as scheduled.
  • The week ahead will see us Welcome back Eickhof Columbaria as they begin installation of all remaining niche cabinets..(Inside the Building & Out)
  • As noted last week: Eickhof Columbaria has completed their offsite fabrication work. Final installation of the interior and exterior niches are scheduled to begin. That installation process could take 10 days or so to complete including all the stone trim, etc.

Wishing everyone a great week ahead!




05.07.2021



Peaceful Progress Continues...



  • Another productive week on site as Adirondack Stone delivers their next load of cut stone with stone masonry work continuing as planned.
  • Decorative and ornamental gates are in the design and fabrication process.
  • Rough Electrical inspections are complete.
  • Spray foam building insulation work is scheduled for the week ahead.
  • Eickhof Columbaria has completed their offsite fabrication work. Final installation of the interior and exterior niches are scheduled to begin in two weeks. That installation process could take 10 days or so to complete including all the stone trim, etc.

Wishing everyone a great week ahead!

Happy Mother's Day 2021!



04-30-2021



Beautiful Artisan Stonework...



This week saw completion of all interior HVAC and electrical rough wiring. Moving forward in the week ahead we will scheduled inspections as needed.

Structural stone finish work continues as the stone mason makes great progress. The week ahead will see continued activity as our next shipment of stone is scheduled for delivery.

Wishing everyone a great week ahead!